Sweida Water Establishment: Maintenance of 4 wells completed

Sweida (ST):  The Public Establishment for Drinking Water in Sweida restarted 4 wells after maintaining and repairing them in a number of areas of the governorate.

The director of maintenance and investment in the Establishment, Engineer Samih Nasr, said in a statement to news reporter today that the restarted wells included the industrial city of Umm al-Zaytoun 1 with a density of 30 cubic meters per hour, Al-Majdal 2 with a density of 28 cubic meters, Al-Raha 4 with the same abundance, and Al-Qurayya 2 with a density of 25 cubic meters per hour.

 

Engineer Nasr indicated that the wells of Umm al-Zaytoun 1 and Majdal 2 industrial city, two new submersible pumps were installed for them after they stopped working for several days, while the submersible pump of Well Al-Raha 4 was replaced, whose density decreased to less than half, as well as the replacement of the Al-Qurayya 2 well pump.

K.Q.

You might also like
Latest news