On January 6th, the workshops of the Electricity Company in al-Hasakah stopped repairing and maintaining the Tel Tamer power transmission station in al-Hasakah countryside as a result of the Turkish occupation and its terrorist mercenaries’ violent attacks with artillery shells on the area.
The Turkish occupation forces and its mercenaries began targeting Umm al-Kaif village in Tel Tamr countryside with artillery, and several shells landed near the maintenance workshops which were fixing the damage caused to the network as a result of the Turkish occupation attacks yesterday.
The Director of the Electricity Company, Eng. Anwar Okla, said \that the workshop staff was fine, and no one was hurt as a result of the Turkish occupation’s shells, pointing out that the workshops “stopped working as a result of the continued fall of the shells in the area.”
Yesterday, the Turkish occupation and its mercenaries from terrorist organizations violently bombed the town of Abu Rasin and the villages located near Tel Tamr, which stopped Tel Tamer power transmission station.
O. al-Mohammad