Aleppo Health Directorate completed the rehabilitation of the health center in the Masaken Hanano neighborhood in Aleppo
Engineer Firas Daghim, head of the engineering department in the Aleppo Health Directorate, said in a statement to SANA that, the center had been rehabilitated with all construction, civil and electrical works and provided with a solar energy system.
He indicated that, the center was rehabilitated in 90 days despite the great damage it suffered as a result of terrorism, noting that it has a floor area of 1700 meters and it is composed of two floors and will be put into service soon.
Engineer, Rama Ghazal, supervisor of the project, pointed out that, all works have been completed, stressing the importance of the center in providing medical and health services to the people of the neighborhood.
Raghda Sawas