The Ministry of Oil and Mineral Resources put the “Deir Attieh 5” gas well in the north of Damascus into service after completing drilling operations.
In a statement, the ministry said that the gas well, which was drilled to a depth of 3678 meters, was connected to the gas production station, pointing out that its production is currently being assessed.
Hamda Mustafa